Maximise the cost effectiveness of wind turbines
Needs
Low carbon energy & Energy mix + Maximizing Profitability + Developing high efficiency & reliability machines
Solution
Develop reliable renewable energy
Customer needs
Wind turbine manufacturer faced with an incident on one of its wind turbines in France
Fracture of the main shaft after 80 months of operation
Suspected presence of a visible defect
Customer benefits
Customer’s assistance during results presentation to French authorities for wind farm commissioning
Scheduling of preventive inspection campaigns based on an implemented procedure
Cetim answer
Failure analysis
Inspection of the main shaft using the ultrasound imaging technique, without removal or long downtime
Delivered results
Determination of the positions and dimensions of the defects to allow the calculation of their harmfulness
Make the processing of collected data easier in order to rapidly determine the condition of the part